Big Leaf House
Magnolia · New house · 2024
Built around a 90-year-old tree we refused to cut. The living room looks straight into its canopy.
Houses and gardens
designed as
one place
Every project starts with
a walk of the site.
Rain, slope, light
and old trees shape
every plan we
draw.
Homes, gardens and backyard cottages across Seattle and the Puget Sound, from Ballard to Bainbridge Island.
Most of our work is in Seattle neighborhoods with steep lots, big trees and a lot of rain. We draw the house and the garden together, so neither is an afterthought.
Magnolia · New house · 2024
Built around a 90-year-old tree we refused to cut. The living room looks straight into its canopy.
Ravenna · Renovation · 2025
Queen Anne · Garden restoration · 2023
Bainbridge Island · Weekend house · 2025
A small house for two, set low on the slope so the neighbors keep their view of the water.
About two thirds of our clients hire us for the house and the land together. One team, one set of drawings, and one fixed fee per phase, agreed before we start.
Credited to your design fee if you go ahead.
A typical new house takes 9 to 12 months to design and permit. A garden can be drawn in six weeks and planted in the fall.
Two hours on your land with an architect and a landscape designer. We look at sun, slope, trees, drainage and views.
Week 1Two or three design options with sketches, a model and a rough cost range from a builder we trust.
4 to 6 weeksFull drawings, materials and planting plans. We prepare and track the city permit application for you.
4 to 8 monthsWe visit the site every week, answer the builder's questions and check the work against the drawings.
8 to 14 monthsWe come back after the first winter to check the drainage and the planting, and adjust what needs it.
Year oneWe are nine architects and landscape designers working from a converted boat workshop in Fremont. We started in 2014 and still take on about fourteen projects a year, so every client works with a partner from the first walk to the last plant.
Leads new homes and additions. Spent eight years designing houses on steep lots before starting the studio.
Runs every garden and rain-garden project, and the plant list that comes with it.
Handles permits and construction visits. The person your builder calls most.
"They moved the whole house four feet so we could keep the maple. Three years on, it is still the best decision in the project."
"Our backyard used to flood every November. Theo's rain garden handled the atmospheric river last winter without a puddle on the patio."
"Clear fees, weekly site visits and drawings our builder actually liked. Our cottage permit came through in eleven weeks."
Tell us about your land and what you have in mind. We reply within two working days, usually with a few questions and a time to visit.